Bathroom Renovation

Designed for comfort. Built to last. Easy to maintain.

Discuss Your Project

What You Can Expect

We renovate bathrooms with disciplined planning and hands-on oversight, so the work stays organized, the details are done right, and the finish quality is consistent.

  • A layout that improves comfort and daily routines
  • Waterproofing and ventilation planned early, and done properly behind the walls
  • Finishes selected for durability and easy maintenance
  • Clean execution, with quality checks at key milestones

What’s Included

Scope varies by project, and final inclusions are confirmed in your written estimate.

Site protection and dust control measures
Demolition and disposal
Layout adjustments
Coordination of licensed electrical trades
Coordination of licensed plumbing trades
Waterproofing and tile preparation
Tile installation and grout/caulking finish
Vanity, hardware, and accessory installation
Paint and final touch-ups
Ongoing quality checks and a final walkthrough

Our Bathroom Process

Clear scope. Well-managed timeline. Quality control at every stage.

STEP 1

Consultation and Scope

Clarify goals and priorities, then confirm scope and inclusions.

STEP 2

Planning and Selections

Confirm layout, key decisions, and lead times before scheduling the build.

STEP 3

Build and Oversight

One point of contact, coordinated trades, consistent oversight.

STEP 4

Final Review and Closeout

Finishing touches, quality checks, walkthrough.

canento-cuisine-2

Bathroom Planning Guide

Key considerations that shape a bathroom that looks refined, performs beautifully, and is built to last.

Layout and daily comfort

Clear circulation, usable storage, and details that support daily routines.

Waterproofing and ventilation

The behind-the-walls work that protects the space and prevents long-term issues.

Lighting and mirrors

Thoughtful lighting and mirror placement, planned early for function and comfort.

Tile and finishes

Materials chosen for durability, maintenance, and your desired aesthetic.

Budget drivers

The key decisions that influence costs, including tile complexity, plumbing moves, and specialty fixtures.

Project Highlights

A selection of recent residential renovations, showcasing our standards for finish quality, detailing, and craftsmanship.

  • Salle de bain avec miroir et surface en marbre-2

    Bathroom Renovation

    West Island, Montreal

  • Salle de bain avec miroir et surface en marbre

    Bathroom Renovation

    West Island, Montreal

RBQ Licence
#5873-5549-01

Insured
RBQ Licence Bond

APCHQ
Member

Written Estimates
Clear Contracts

West Island
Greater Montreal

Bathroom FAQs

Do you assist with bathroom layout and material selections?

Yes. We help clarify layout priorities and guide key selections that affect comfort, maintenance, schedule, and budget, so key decisions are confirmed before construction begins.

Can you work with our interior designer or architect, or provide design support?

Yes. If you already have a designer or architect, we collaborate with them and coordinate the build around the approved plans and specifications. If you don’t, we can bring in trusted design partners to support layout planning and selections for a more turnkey experience.

How long does a typical bathroom renovation take?

Timelines depend on scope and lead times, especially tile, specialty fixtures, and custom pieces. Once scope and selections are confirmed, we provide a schedule based on the work sequence and current lead times, then manage it closely through construction.

Can we remain in our home during a bathroom renovation?

Often, yes. We plan work zones and dust control up front, and we coordinate the sequence to keep day-to-day life as manageable as possible.

How are project costs and estimates structured for a bathroom?

After scope and key decisions are defined, we provide a written estimate aligned to that scope. Tile scope, plumbing changes, and fixture selections are common cost drivers, so we confirm them early to keep pricing clear.

What decisions should be made early to avoid delays?

Layout, waterproofing approach, fixture specifications, and tile selections. Confirming these early helps align ordering, scheduling, and installation.

Ready to discuss your renovation?

Tell us what you’re planning, and we’ll reply with next steps.

Discuss Your Project

cta-cuisine-canento
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.